Commercial & New Construction
Commercial and new construction painters in Palestine and Tyler, Texas
Offices, retail floors, medical suites and new builds, painted on a schedule that keeps your doors open, from our base in Palestine to Tyler and beyond.
Chapter 01
A working space can’t just stop for the paint crew
Painting an empty house and painting an office, a store or a clinic are different problems. The room is still in use, people are still in it, and the paint has to be dry, sealed and out of the way before the next shift or the next patient walks in. What fails on these jobs is rarely the color. It is the schedule, the dust and the scuffed corner nobody protected.
Offices in Palestine and Tyler run from executive offices and conference rooms to open workspace, cubicle zones, reception areas and break rooms. Retail runs from the storefront and display areas to sales floors, walkways, fitting rooms and service counters, plus the storage and back-of-house rooms customers never see but staff work in all day. Each space wants a different finish and a different order of work.
Medical and healthcare spaces carry their own standards. Patient rooms and waiting areas, exam and treatment rooms, lab and clinical areas and administrative offices call for materials and techniques suited to sterile environments and infection control protocols, so we choose products with that in mind before we talk color.

Sage green cabinets freshly sprayed along a bare concrete floor in a new build with large windows
Scheduling around your hours, not ours
A small office usually takes 2 to 5 days. Larger commercial spaces can take 1 to 3 weeks. We lay out a detailed schedule in the proposal so you know which area is closed off and when, and we can work evenings, weekends and holiday periods so your doors stay open on business days.
Before a brush touches anything, we move and cover furniture, equipment and flooring. If the building has management or a property owner, we coordinate with them on the approvals we need before we start, and we help with permit requirements so paperwork doesn’t hold up the crew.
Chapter 03
Same finish in the last room as in the first
On a big job, the last room has to match the first, and that takes specifications and checkpoints, not luck.
Large projects drift when nobody owns the details. We work from detailed specifications, run quality checkpoints along the way and keep an experienced project manager on the job, so the conference room finished on Friday matches the reception area from Monday.
New construction is the same discipline with a longer runway. We partner with custom builders on complete painting packages, from drywall finishing to the final coats, so the space is ready for handoff and the next trade is not waiting on us.
Lomax's Custom Painting. Fully insured. Call (903) 320-5032.
Space type spec sheet
Twelve kinds of room, one crew
Small offices run 2 to 5 days and larger spaces 1 to 3 weeks. The schedule, the protection plan and the permit questions are settled before the first coat.
Fully insured, with Sherwin-Williams or Benjamin Moore on the wall unless you ask for something else. Painting a house instead? Start with interior painting.
Tell us about the building on the contact page, or see everything we paint on the services page.
Offices and professional spaces
Executive offices and conference rooms
Clean cut lines at ceilings and trim. These are the rooms clients sit in.
Open workspace and cubicle zones
Long wall runs, so consistent technique and batching keep the finish even.
Reception and customer-facing areas
The first impression, so we schedule it for when the doors are closed.
Break rooms and common areas
Washable finishes for the rooms that take the most daily wear.
Retail and customer spaces
Storefront and display areas
Color and finish shape how the brand reads from the sidewalk.
Sales floors and customer walkways
Evening and weekend work, so the floor opens on time.
Fitting rooms and service counters
Small spaces touched all day, so the finish has to be durable.
Storage and back of house
Staff work here all day, so it gets the same prep as the front.
Medical and healthcare facilities
Patient rooms and waiting areas
Calm, clean surfaces in products chosen for healthcare environments.
Examination and treatment rooms
Materials and techniques suited to infection control protocols.
Laboratory and clinical areas
Sterile environments, so product choice comes before color.
Administrative and staff areas
Scheduled around clinic hours, like everything else.


On the builder’s schedule
For new construction we partner with custom builders and carry the whole painting package, from drywall finishing to the final coats, so the house or the suite is ready for handoff. Builders in Tyler and around Palestine can reach us through the Tyler page or the contact page.

